RAD-35_with_CDS_Manual_Evaluation

In this pre-Connectathon test, we will evaluate a sample RAD-35 DFT message produced by your system.

Since CDS-OAT is a new profile, we do not yet have a tool to evaluate the specific requirements for RAD-35 in CDS-OAT, so we will validate your message using:manual scrutiny of the message for requirement added for compliance to the CDS-OAT profile.

This is the same evaluation we will perform during the Connectathon.  This test enables you to prepare in advance.

Instructions
  1. Capture a [RAD-35] DFT^P03 message as produced by your system.  Create a file containing the contents of that message.
  2. In Gazelle, select menu Connectathon-->Pre-Connectathon testing and find your list of pre-Connectathon by clicking on the link in the "To complete" column
  3. Paste a copy of your message into the chat window for this pre-Connectathon test.
  4. Change the Status of your test to "Verified by vendor"
Evaluation
 
We examine your message using the same evalution defined in the Connectathon test for this message:
 
1. in Gazelle, select menu Connectathon-->Connectathon.
2. Find test "RAD-35_with_CDS_Scrutiny" for your test system
3. In the Evaluation section of that test, you will find the message segments and fields that we will look for in your message.