All changes

Bug

5.7.1

  • [GZL-4601] The buttons for monitor related to Validate all the status (or not) contains a workflow issue
  • [GZL-4606] I am a monitor and administrator, when I set a test to “to be verified”, it is automatically claimed by me
  • [GZL-4616] Missing translation
  • [GZL-4640] NA2018: Exception when adding 2 monitor user account – account not added

5.7.2

  • [GZL-4461] Monitor assignement, Excel export : Assigned test number column present but empty.
  • [GZL-4481] When you edit a user, the help images are not aligned with the checkbox and roles
  • [GZL-4623] When you import a system from an old testing session, it is automatically accepted
  • [GZL-4633] Need to fix invoice and financial summary generation
  • [GZL-4635] GMM: Delete a role from a test, and all associated test steps are deleted w/o warning!
  • [GZL-4636] Impossible to validate Integration Statement
  • [GZL-4638] Editing a system in gazelle shows wrong keyword
  • [GZL-4639] Pre-CAT test results page: Unexpected behavior about a description of test instance.
  • [GZL-4641] Impossible to delete a system
  • [GZL-4642] NPE in gazelle-na log
  • [GZL-4645] Network configuration: Host editing is broken
  • [GZL-4649] Test Instance Page: Gazelle does not cache comments before posting
  • [GZL-4650] Unable to display admin-manage-system page if a simulator has been created
  • [GZL-4651] Can’t copy system and it would be nice to have a sort in the list of session per year in the “import system from other session” option
  • [GZL-4653] GMM: I was allowed to delete a RoleInTest that was used in a test.
  • [GZL-4654] Download test doesn’t work when description is only in french
  • [GZL-4658] Can’t update user when email is wrong

Story

  • [GZL-4610] Connectathon results report use IHE logo per default. Use Testing Session logo instead

Improvement

5.7.1

  • [GZL-4507] When an administrator marks a test Critical, that admin should not also claim the test
  • [GZL-4564] NA2018: Do we need another configuration type?
  • [GZL-4603] We don’t have the email of the users in the excel export from the admin user page, is there a reason for this?
  • [GZL-4615] Block claim/unclaim TI when status is verified or failed
  • [GZL-4632] Compilation of jasper reports need to be improved.
  • [GZL-4648] Monitor Worklist Page: Could you change the default sort order for the usability.

5.7.2

  • [GZL-3691] Improve test lifecycle
  • [GZL-4435] It is good to have a notification email when someone change the password of the user.
  • [GZL-4561] Update system automated tests
  • [GZL-4624] When you access to the “system acceptance page”, and you want to “not accept” already accepted system, it does not work
  • [GZL-4646] Need to improve invoice and financial summary
  • [GZL-4652] Consider updating GMM to show step count for each role
  • [GZL-4655] Consider adding a password reset button for managers
  • [GZL-4660] add missing translation to crowdin and translate them

Dependencies

[INFO] Scanning for projects...
[INFO] ------------------------------------------------------------------------
[INFO] Reactor Build Order:
[INFO]
[INFO] Gazelle Test Management Platform
[INFO] gazelle-tm-ejb
[INFO] gazelle-tm-war
[INFO] gazelle-tm-ear
[INFO]                                                                         
[INFO] ------------------------------------------------------------------------
[INFO] Building Gazelle Test Management Platform 5.7.2
[INFO] ------------------------------------------------------------------------
[INFO]
[INFO] --- gazelle-plugins:1.60:check-dependencies (default-cli) @ gazelle-tm ---
Check dependencies :: All the dependencies are up to date.
[INFO]                                                                         
[INFO] ------------------------------------------------------------------------
[INFO] Building gazelle-tm-ejb 5.7.2
[INFO] ------------------------------------------------------------------------
[INFO]
[INFO] --- gazelle-plugins:1.60:check-dependencies (default-cli) @ gazelle-tm-ejb ---
Check dependencies :: All the dependencies are up to date.
[INFO]                                                                         
[INFO] ------------------------------------------------------------------------
[INFO] Building gazelle-tm-war 5.7.2
[INFO] ------------------------------------------------------------------------
[INFO]
[INFO] --- gazelle-plugins:1.60:check-dependencies (default-cli) @ gazelle-tm-war ---
Check dependencies :: All the dependencies are up to date.
[INFO]                                                                         
[INFO] ------------------------------------------------------------------------
[INFO] Building gazelle-tm-ear 5.7.2
[INFO] ------------------------------------------------------------------------
[INFO]
[INFO] --- gazelle-plugins:1.60:check-dependencies (default-cli) @ gazelle-tm-ear ---
Check dependencies :: All the dependencies are up to date.
[INFO] ------------------------------------------------------------------------
[INFO] Reactor Summary:
[INFO]
[INFO] Gazelle Test Management Platform ................... SUCCESS [  3.142 s]
[INFO] gazelle-tm-ejb ..................................... SUCCESS [  5.582 s]
[INFO] gazelle-tm-war ..................................... SUCCESS [  1.155 s]
[INFO] gazelle-tm-ear ..................................... SUCCESS [  2.630 s]
[INFO] ------------------------------------------------------------------------
[INFO] BUILD SUCCESS
[INFO] ------------------------------------------------------------------------
[INFO] Total time: 14.782 s
[INFO] Finished at: 2017-12-21T11:40:50+01:00
[INFO] Final Memory: 58M/1199M
[INFO] ------------------------------------------------------------------------

Remarks