Uploaded image for project: 'Gazelle Test Management'
  1. Gazelle Test Management
  2. GZL-2609 TM - Connectathon Report need to evolve in order to be consistent with ISO 17025.
  3. GZL-2990

In case the tests are not performed within the test lab, we need to include the address where the test session took place.

    Details

    • Type: Technical task
    • Status: Closed
    • Priority: Critical
    • Resolution: Fixed
    • Affects Version/s: TestManagement-3.9-RC12
    • Fix Version/s: TestManagement-4.7.0
    • Component/s: None
    • Labels:
    • Account:
      IHE Europe (IHE2012)

      Description

      We need an address for the testing session. The address of the testing session is required if the testing session is of type "certification"
      We need to include the address of the testing session in the report.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                jlabbe Jean-François Labbé (Inactive)
                Reporter:
                epoiseau Eric Poiseau
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 2 hours
                  2h
                  Remaining:
                  Remaining Estimate - 0 minutes
                  0m
                  Logged:
                  Time Spent - 2 hours
                  2h

                    Potential Duplicates