Uploaded image for project: 'Gazelle Test Management'
  1. Gazelle Test Management
  2. GZL-3478

populate GMM DB with audit messages from TF

    Details

    • Sprint:
      Sprint 40
    • Account:
      IHE Europe (IHE2012)

      Description

      populate the database of GMM with the list of audit messages present in the various technical frameworks from IHE

        BigPicture - Work Breakdown Structure

          Attachments

            Activity

              People

              Assignee:
              aberge Anne-Gaelle Berge
              Reporter:
              aberge Anne-Gaelle Berge
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                BigPicture - Skills

                  Dates

                  Created:
                  Updated:
                  Resolved:

                    Time Tracking

                    Estimated:
                    Original Estimate - 6 hours
                    6h
                    Remaining:
                    Remaining Estimate - 0 minutes
                    0m
                    Logged:
                    Time Spent - 6 hours
                    6h

                      Potential Duplicates