Uploaded image for project: 'Gazelle Test Management'
  1. Gazelle Test Management
  2. GZL-3691

Improve test lifecycle

    Details

    • Sprint:
      2017 - S14
    • Account:
      Maintenance 2017 (MAINTENANCE2017)

      Description

      In the context of the CAS-2, we should be able to trace the history of the tests. In particular, we need to know who validates a test when; currently we do not display when a test was validated.
      In addition, a change in a "validated" test shall set back the validated attribute to false until someone reviews it and validates it again.
      It would be convenient, in the comment section of the test to report the following actions (at least for tests used in accredited testing sessions): test has been validated, test has been updated

      http://molene.kereval.com/tutos/php/bugtracking/bug_show.php?id=232175

        BigPicture - Work Breakdown Structure

          Attachments

            Activity

              People

              Assignee:
              gthomazon Guillaume Thomazon
              Reporter:
              aberge Anne-Gaelle Berge
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                BigPicture - Skills

                  Dates

                  Created:
                  Updated:
                  Resolved:

                    Time Tracking

                    Estimated:
                    Original Estimate - 1 day
                    1d
                    Remaining:
                    Remaining Estimate - 0 minutes
                    0m
                    Logged:
                    Time Spent - 4 hours, 30 minutes Time Not Required
                    4h 30m

                      Potential Duplicates