Uploaded image for project: 'Gazelle Test Management'
  1. Gazelle Test Management
  2. GZL-3691

Improve test lifecycle

    Details

    • Account:
      Maintenance 2017 (MAINTENANCE2017)

      Description

      In the context of the CAS-2, we should be able to trace the history of the tests. In particular, we need to know who validates a test when; currently we do not display when a test was validated.
      In addition, a change in a "validated" test shall set back the validated attribute to false until someone reviews it and validates it again.
      It would be convenient, in the comment section of the test to report the following actions (at least for tests used in accredited testing sessions): test has been validated, test has been updated

      http://molene.kereval.com/tutos/php/bugtracking/bug_show.php?id=232175

        Attachments

          Activity

            People

            • Assignee:
              gthomazon Guillaume Thomazon
              Reporter:
              aberge Anne-Gaelle Berge
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Time Tracking

                Estimated:
                Original Estimate - 1 day
                1d
                Remaining:
                Remaining Estimate - 0 minutes
                0m
                Logged:
                Time Spent - 4 hours, 30 minutes Time Not Required
                4h 30m

                  Potential Duplicates