Uploaded image for project: 'Gazelle Test Management'
  1. Gazelle Test Management
  2. GZL-4305

Connectathon results Automatic Grading

    Details

    • Type: Improvement
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: Gazelle TM 5.4.4
    • Component/s: None
    • Labels:
      None
    • Account:
      Maintenance 2016 (MAINTENANCE2016)

      Description

      In Connectathon > Connectathon > ConnectathonResult. https://gazelle.ihe.net/EU-CAT/testing/results/connectathonResults.seam?integrationProfileOption=1&system=1696&testSession=35&sort.id=ascending
      As admin, you filter by system and you must set result by hands.
      But sometimes there is Pass result which depends on previous test which is failed.
      So the both results could be failed.

      If some rules are not respected, we need to add a check to verify and inform admin.
      Take a look at TFDependenciesManager.java

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                gthomazon Guillaume Thomazon
                Reporter:
                gthomazon Guillaume Thomazon
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 2 days Original Estimate - 2 days
                  2d
                  Remaining:
                  Time Spent - 2 days Remaining Estimate - 30 minutes
                  30m
                  Logged:
                  Time Spent - 2 days Remaining Estimate - 30 minutes
                  2d

                    Potential Duplicates