KPI for systems mixes pre-connectathon and connectathon tests

    Details

    • Sprint:
      2017 - S1
    • Account:
      NA-SUPPORT (NASUPPORT)

      Description

      When you select KPI for systems, the test counts include both connectathon and pre-connectathon tests. I believe in the 4.x version, you included only connectathon tests. That is the count that we need.

      Note that your display shows tests in different states (running, aborted, paused) which only make sense when you are in a Connectathon. So, the combination of these (pre-Connectathon and Connectathon) does not help.

      For NA 2017, if you could just remove the pre-Connectathon counts from the summary, that would be helpful.

      In the future, if you want to add a filter so that we can see pre-Connectathon or Connectathon tests separately, that would be OK.

      As it is today, we lost display that we rely on to do Connectathon work.

        BigPicture - Work Breakdown Structure

          Attachments

            Activity

              People

              Assignee:
              aberge Anne-Gaelle Berge
              Reporter:
              smoore Steve Moore
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                BigPicture - Skills

                  Dates

                  Created:
                  Updated:
                  Resolved:

                    Time Tracking

                    Estimated:
                    Original Estimate - 1 hour
                    1h
                    Remaining:
                    Remaining Estimate - 0 minutes
                    0m
                    Logged:
                    Time Spent - 1 hour
                    1h

                      Potential Duplicates