Uploaded image for project: 'Gazelle Test Management'
  1. Gazelle Test Management
  2. GZL-4847

Links between standards and transactions shall be created at import

    Details

    • Type: Improvement
    • Status: In qualification
    • Priority: High
    • Resolution: Unresolved
    • Affects Version/s: Gazelle TM 5.10.0
    • Fix Version/s: None
    • Component/s: TF Concepts Management
    • Labels:
      None

      Description

      See GZL-4846

      The new version of the export will contain the list of standards applicable to each transaction, when the transactions are created, the standards shall be created (if does not exist) and linked to the transaction so that we keep a consistency between all the instances of Gazelle Test Management which refers the same profiles

        BigPicture - Work Breakdown Structure

          Attachments

            Activity

              People

              Assignee:
              wbars Wylem Bars
              Reporter:
              aberge Anne-Gaelle Berge
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                BigPicture - Skills

                  Dates

                  Created:
                  Updated:

                    Time Tracking

                    Estimated:
                    Original Estimate - Not Specified
                    Not Specified
                    Remaining:
                    Remaining Estimate - 0 minutes
                    0m
                    Logged:
                    Time Spent - 2 hours
                    2h

                      Potential Duplicates