Skip to main content

What is the difference between the simulator and the real system?

The simulator plays the role of the interoperability partner and is managed by the administrator. The system under test is the implementation whose conformance and interoperability are being assessed.

The simulator is used during the preparatory phase of an interoperability event to simulate a testing partner, whereas the system under test is the tested system.

Diagram showing a System under test at the center, linked to a Simulator to the left in a box 'Preparatory phase' and to another System under test to the right, in a box 'Interoperability event'.